Woodworker's Journal 2004-Winter, страница 41

Woodworker

Pinup Shop Drawings Sharpening Station

Work Top Support Locations

(Side View)

3/4" 3/4"

13"-^-12"-»-|

-13"-

3/4"

-i I—

Center your screws on the frame supports and ends. Keep one inch between the screws on pieces 47 and 48, and two inches between the screws on piece 46.

See Full-Size Pattern for hole location.

®

Mount the top by holding the left frame end (piece 46), flush to the carcass side (piece 2). (2)"

155/b"-

Caster Location

(Bottom View)

1"

51/2"

12"

©

Countersink for five screws to attach the bottom to the center divider.

(sf

*

h