Woodworker's Journal 2006-30-Winter, страница 50

Woodworker

Planning Ahead: Clamping Station Project

Constructing the clamping station will require about 30 hours of shop time. You'll need a circular saw, table saw, jigsaw and drill. A dado blade is also called for extensively. Finish the project in varnish or lacquer.

• 3 sheets of 3/4" white oak plywood

• 15 board feet of 3/4" white oak

• 4 board feet of 3/4" walnut

• 3 board feet of 1/" walnut

• One 24"x24"piece of 1/8" acrylic

11

T x W x L

T x W x L

1 Oak Banding (10)

1/4" x 3/4" x 96"

12 Back (1)

3/4" x 48" x 7514"

2 Left Side (1)

3/4" x 1334" x 76"

13 Side Door Front (1)

3/4" x 1034" x 7514"

3 Divider (1)

3/4" x 13" x 7514"

14 Cupboard Doors (2)

3/4" x 1714" x 2612"

4 Right Side (1)

3/4" x 7" x 76"

15 Walnut Banding (1)

1/4" x 3/4" x 60"

5 Top (1)

3/4" x 1334" x 4814"

16 Piano Hinges (4)

112" x 36" (brass finish)

6 Bottom (1)

3/4" x 1334" x 4814"

17 Door Catches (3)

Magnetic

7 Fixed Shelf (1)

3/4" x 13" x 3612"

18 Block (1)

3/4" x 114" x 2"

8 Side Door Sides (2)

3/4" x 634" x 76"

19 Door Knobs (3)

134" Dia. (beech)

9 Side Door Top/Bottom (2)

3/4" x 634" x 1034"

20 Shelf Supports (4)

1/4" Dia. Posts

10 Screws (100)

#8-112"

21 Adjustable Shelf (1)

3/4" x 1212" x 3534"

11 Walnut Plugs (100)

3/8" Dia.

22 Feet (6)

3/4" x 234" x 234"

50

Workshop Projects